Trial Operation And Testing - Daikin FFQ09Q2VJU Manual De Instalación

Ocultar thumbs Ver también para FFQ09Q2VJU:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Field Settings
4.
When using as a pair unit, you may control up to 16 units
with the remote controller.
In this case, all the indoor units in the group will operate in
accordance with the group control remote controller.
Select a remote controller which matches as many of the
Wiring Method (Refer to
1) Remove the electrical wiring box cover.
2) Cross-wire the terminal block for remote controller (P
(Refer to Table 3 in
5.
When using 2 remote controllers, one must be set to "MAIN" and the other to "SUB".
Wiring Method (Refer to
1) Remove the electrical wiring box cover.
2) Add remote controller 2 to the terminal block for remote controller (P1, P2) in the electrical wiring box. (There is no polarity.)
(Refer to Table 3 in

Trial Operation and Testing

CAUTION
cause electric shock.
the unit.
1.
Trial operation and testing
Make sure to install the decoration panel before carrying out trial operation if the wireless remote controller is used.
To protect the air conditioner, restart operation is disabled for 3 minutes after the system has been turned off.
1-4.
mode using the following method.
Refer to
Refer to
17
on page 11.)
, P
) inside the electrical wiring box. (There is no polarity.)
1
2
on page 12)
on page11.)
on page 12)
on page 18.
on page 19.
Outdoor unit 1
Outdoor unit 2
Indoor unit 1
Indoor unit 2
Group control remote controller
Outdoor unit 3
Indoor unit 3
English

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ffq12q2vjuFfq15q2vjuFfq18q2vju

Tabla de contenido