Indoor Unit Installation; Suspension Bolt Position - Daikin FFQ09Q2VJU Manual De Instalación

Ocultar thumbs Ver también para FFQ09Q2VJU:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Indoor Unit Installation

1.
For decoration panel type A
Top view
Suspension bolt pitch
23-1/16-26 (585-660)
Side view
23-1/16-26 (585-660)
*
13/16
(20)
NOTE
*If the panel does not extend over the ceiling by this amount, supplement with extra ceiling material or restore the ceiling.
Install the inspection opening on the electrical wiring box side where maintenance and
inspection of the electrical wiring box and drain pump are easy.
English
Refrigerant
piping
Suspension
bolt (×4)
21 (533)
2-1/2
22-5/8 (575)
(63)
Indoor unit
Ceiling opening
27-9/16 (700)
Decoration panel
Ceiling opening
Hanger
bracket
False ceiling
*
13/16
(20)
For decoration panel type B
Top view
Suspension bolt pitch
23-1/16-23-7/16 (585-595)
Side view
23-1/16-23-7/16 (585-595)
*
1/2
(12.5)
Refrigerant
piping
Suspension
bolt (×4)
21 (533)
2-1/2
22-5/8 (575)
Indoor unit
(63)
Ceiling opening
24-7/16 (620)
Decoration panel
Ceiling opening
Hanger
bracket
False ceiling
*
1/2
(12.5)
unit: inch (mm)
Electrical wiring box
Inspection
opening
6

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ffq12q2vjuFfq15q2vjuFfq18q2vju

Tabla de contenido