SMA SUNNY TRIPOWER CORE1-US Instrucciones De Instalación página 40

Ocultar thumbs Ver también para SUNNY TRIPOWER CORE1-US:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6 Electrical Connection
Damage to the DC connectors due to the use of contact cleaner of other
cleaning agents
Some contact cleaners or other cleaning agents may contain substances that decompose the
plastic of the DC connectors.
• Do not use contact cleaners or other cleaning agents for cleaning the DC connectors.
Destruction of the inverter due to overvoltage
If the open-circuit voltage of the PV modules exceeds the maximum input voltage of the inverter,
the inverter can be destroyed due to overvoltage.
• If the open-circuit voltage of the PV modules exceeds the maximum input voltage of the
inverter, do not connect any strings to the inverter and check the design of the PV system.
Destruction of the measuring device due to overvoltage
• Only use measuring devices with a DC input voltage range of 1000 V or higher.
Procedure:
1. Ensure that the circuit breaker is switched off and that it cannot be reconnected.
2. Ensure that the AC load-break switch and the DC
load-break switch are in the O position and are
secured against reconnection.
3. Secure the DC load-break switch against
reconnection using a padlock.
4. Connect each equipment grounding conductor of the PV array to an equipment grounding
terminal:
• Strip the insulation of the equipment grounding conductor by 10 mm (0.4 in).
40
STP33-62-US-41-IA-xx-12
NOTICE
NOTICE
NOTICE
SMA Solar Technology AG
O
O
Installation Manual

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Stp 33-us-41Stp 50-us-41Stp 62-us-41

Tabla de contenido