4
Operation
Pre-shift checks
Functional test of the Safety Guard stat-
ic warning unit
NOTE
The functional test must be completed regard-
less of the industrial truck component configu-
ration. When using the Safety Guard commu-
nication unit, perform the following steps as
well.
The functional test checks the warning zones
that have been set and any responses that
have been set on the industrial truck.
Switch on the industrial truck.
The display unit switches on.
Check the operational readiness of the stat-
ic warning unit.
The "operating status" LED must flash green.
Drive the industrial truck to the warning
zone. During this process, the driver moni-
tors the display unit and any responses that
have been set on the industrial truck. A sec-
ond person monitors the static warning unit.
Fault messages and irregularities on the dis-
play unit or the static warning unit during the
test are not permitted.
If necessary, have the warning zones and
the truck settings set up again by the serv-
ice partner.
48
Operating Instructions - 3008011701 EN - 11/2019
1
2
3
4
LSG_0059