INSTALLATION

2.1

BOILER ROOM

The. boilers. with. a. rating. of. more.
than. 35. kW. must. be. equipped. with.
a.technical.room.whose.dimensions.
and.requirements.correspond.to.the.
current.standards.and.regulations..
The.minimum.distance.between.the.
walls. of. the. room. and. the. boiler.
must.not.be.less.than.0.60.m.,.while.
the. minimum. height. between. the.
AQUA HE 25-35 ErP BE
top. of. the. boiler. and. the. ceiling.
must. be. at.least. 1. m..which. can. be.
reduced. to. 0.50. m.. for. boilers. with.
incorporated. heaters. (however. the.
minimum. height. of. the. boiler. room.
must.not.be.less.than.2,5.m)..
The.boilers.with.a.rating.of.less.than.
35. kW. can. be. installed. only. in. per-
fectly.air-vented.rooms..
To.circulate.air.in.the.room,.air.vents.
must. be. made. on. the. outside. walls.
2
bar
1
3
0
4
OPEN
which. satisfy. the. following. require-
ments:
–..Have. a. total. surface. area. of. at.
least.6.cm
of. thermal. capacity. and. however.
not.less.than.100.cm
–..To.be.situated.as.close.as.possible.
to. the. floor,. unobstructable. and.
protected. by. a. grate. which. does.
AQUA HE 25-35 INOX ErP BE
2
.for.each.installed.Kw.
2
.
2
bar
1
3
0
4
Fig..4