7. Life Phases
7.2 Installation
7.2.1 General
The controller is only to be fixed at the points specified for the installation.
Routing of electrical leads
When routing electrical leads, ensure that
•
these cannot become trapped,
•
no mechanical load is exerted on them,
•
they cannot become damaged in any other way, and
•
obstacles do not pose any risks to persons.
Putting into service
A test run has to be carried out before putting into operation with 1 or 2 columns. The columns
should not be interconnected mechanically at this time. Other connections and mechanical fac-
tors which may damage the columns must not be present. There is a danger of breakage. A check
should be made that the traversing path is switched off safely in the end position.