Commissioning The Position Controller; Adapting To The Operating Conditions - Aventics R412004397 Instrucciones De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 159
+ 24 V
0 V
FE
Fig. 9:
"Position controller as a 19" assembly" connection assignments
AVENTICS | Position Controller | R412004397–BDL–001–AC
"Position controller as a 19" assembly"
connection assignments
d 4
7
Commissioning the position
controller
7.1

Adapting to the operating conditions

Before commissioning the position controller, you first have to
adapt it to the respective operating conditions.
The settings in the sections "Special position controller
versions" and "Switching between creep speed and rapid
speed" must be done before switching on the operating
voltage.

Commissioning the position controller

61
0 - 20 mA
0 - 20 mA

Publicidad

Tabla de contenido
loading

Tabla de contenido