Installation/Putting Into Service; Details For Fixing The Beacon To The Ground; Removing The Cover - Astralpool Corail protect Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. INSTALLATION / PUTTING INTO SERVICE
All the installation and adjustment stages must be carried out with the key in the "All off"
position

4.1 Details for fixing the beacon to the ground

The beacons must be fixed on a stable, flat surface; for best results, they should be fixed on concrete
pedestals.
The dimensions shown for fixing are valid for stable ground. In the case of unstable ground (sand, clay,
etc.) enlarge the pedestal size to 40 x 40 x 40 cm.

Removing the cover

3 anchoring studs or
fastening screws 9,5 Ø
Cell orientation window
1. Remove the 3 screws holding the cover in place
2. Remove the cover, taking care not to damage the cells
versión 1-2008
14

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido