Progress PHN 1320 Instrucciones De Uso página 23

Ocultar thumbs Ver también para PHN 1320:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

50°C (above room temperature) at any point
along its length.
After the connection has been carried
out, the heating elements must be tested by
being operated for about. 3 minutes.
Terminal block
The appliance is fitted with an easily-ac-
cessible 6-way terminal block, with its links
already set for operation on a 400V supply
with neutral (see illustration).
In the case of a different supply voltage,
the terminal block links must be turned in
line with the schemes shown in the
illustration. The protective conductor is
connected to the
connection, secure the cable to the terminal
block with strain relief.
Electrical connection to the hob
Attention - observe the installation
instructions for hob, built-in cooker
or control box!
This appliance can be connected to the hob
models specified in the «Technical data» sec-
tion. The socket for connecting the hob is lo-
cated on the cooker housing. The connecting
cables of the heating elements and the protec-
tive conductor cable are brought out from the
built-in hob; these cables are fitted with plug
connections. Insert the plugs and connecting
cables in the appropriate sockets. This pre-
vents any possible wrong connection.
The manufacturer accepts no liability if
the safety measures are not observed.
l.
termina
After
1 2 3 4 5
230V 3~
L1
L2
Ø 4x2,5 mm²
1 2 3 4 5
230V 1~
Ø 3x4 mm²
L1
1 2 3 4 5
400V 2N~
Ø 4x2,5 mm²
L1 L2
1 2 3 4 5
400V 3N~
L1 L2 L3 N
Ø 5x1,5 mm²
23 progress
L3 PE
N
PE
N
PE
PE

Publicidad

Tabla de contenido
loading

Tabla de contenido