• The installation room is adequately lit.
• The plant room where the SANIPUMP
allow a 600 mm clearance around and above the device to facilitate any maintenance operations.
• Stop valves must be fitted on the effluent inlet as well as on the discharge line, as close as possible
to the pumping station.
• Install a non-return valve on the pumping station outlet to prevent unintended start-up.
• The discharge line must be designed to prevent any back-flow of sewage.
• By fitting a non-return loop, located above the back-flow level, back-flow is avoided.
PLEASE NOTE: Unless otherwise specified locally, the back-flow level is the level of the
highway (roads, pavement, etc.). Extend this line after the non-return loop through a larger
diameter pipe.
• The pumped fluid is appropriate and authorised by this documentation (paragraph 3.5).
• In case of discharge of greasy effluents, the use of a degreasing tank is essential.
Wastewater other than those mentioned above, for example, of artisanal or industrial origin,
must not be discharged into the pipes without prior treatment.
3.7 Electrical connection
Electrical connection work performed by an unqualified individual. Risk of
death by electric shock!
➜ The electrical connection must be carried out by a qualified and licensed
electrician.
➜ The electrical installation must meet the current standards in the country.
Wrong supply voltage. Damage to the pumping station!
➜ The supply voltage must not differ by more than 6% of the rated voltage
specified on the rating plate.
Only carry out the electrical connections after the final connections have been completed.
The device must be connected to an earthed junction box. The power supply circuit must be
protected by a 30 mA differential circuit breaker rated at 16 A.
The connection must be used exclusively to provide the power to the product.
If the power cord is damaged, to prevent possible danger, it must be replaced by the manufacturer,
customer service team or a similarly qualified individual.
4. ACTIVATION
4.1 Prerequisites for commissioning
Before commissioning the pumping station, make sure that the electrical connection of the pumping
station has been carried out correctly.
• The safety instructions have been followed.
24
pumping station will be installed must be large enough to
®