ASSEMBLING "EASY 2"
A = Left side
B = Right side above the power cables sheath
Apply the drilling template 'C' above the side 'B'.
Drill the holes as shown in the template.
Apply the drilling template above the side 'A'.
Drill just the small holes.
Introduce suitable threaded inserts in the 8 small holes on sides A and B.
14