Commissioning The Boiler - Baxi FOURTECH 24 F Manual Para El Usuario Y El Instalador

Caldera mural de gas de alto rendimiento
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 68
To light the boiler correctly, proceed as follows:
1) power the boiler
2) open the gas tap;
3) press the button (
and switch the boiler to Summer (
)
4) press the heating circuit (
the main burner.
When the boiler is lit, the symbol ( ) will appear on the display.
In the Summer position (
Warning:
During initial ignition, the burner may not ignite (causing the boiler to shut down) until any air in the gas pipes is vented.
In this case, repeat the ignition procedure until gas reaches the burner. Press button ( ), for at least 2 seconds.
SYMBOL KEY
Operation in the heating mode
Flame present (burner on)
No flame (ignition failure)
Operation in the DHW mode
Generic fault
RESET
No water (Low system pressure)
Numerical signal (Temperature, fault code, etc.)
Figure 1
INSTRUCTIONS FOR USERS

3. COMMISSIONING THE BOILER

) and domestic hot water circuit (
) the main burner will only ignite if a DHW tap is turned on.
), Winter (
) or heating only (
) temperature adjustment buttons (
BUTTON KEY
On/Off/Summer/Winter
+/-
(
) CH Temperature Adjust (Heating)
+/-
(
) DHW Temperature Adjust (Hot Water)
Reset
Information
38
);
+/-
) in order to ignite
926.116.5 - EN

Publicidad

Tabla de contenido
loading

Tabla de contenido