4.
Installation of the pellet-run boiler
Before installing, please perform the following steps:
Upon reception, check the product for completeness and to determine that is
does not show any damage signs. Any damages or defects should be checked
before the unit is installed.
The unit is equipped with four height adjustable feet at its base, allowing for
simple adjustments when installing on non-flat surfaces.
Remove the instruction manual from the package and hand it over to the client.
Connect a 100 mm diameter pipe between the boiler's combustion gases output
and the fume extraction pipe leading out of the building (e.g. through the chimney)
– please check diagrams in point 4.
If a tube is used for combustion air inlet from the outside, it shall be no longer
than 60cm horizontally or present offsets (such as bends);
Carry out the hydraulic installation (please consult point 4.5)
Connectthe 230 VAC power cable to an grounded socket.
The unit's remote control has a programmable thermostat. Optionally, a
conventional external programmer may be used (not included) to automatically
define the unit's operating periods.
Figure 3 – Adjustable feet
8