Nozzle Boot Installation; Pump Foot Installation - Tuthill Fill-Rite Nextex NX3200 Series Manual De Operación Y Seguridad Del Propietario

Bomba de transferencia de combustible alimentada por cc con flujo alto
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3. Mount the pump on the adapter; making sure the seal and screen are
installed as shown. (Figure 3).
IMPORTANT! Be certain the screen is properly seated in the
indentation in the tank adapter before installing seal and tank
adapter to the pump. Failure to properly seat the screen can
result in fluid leakage.

Nozzle Boot Installation

Install the nozzle boot using the supplied attaching bolt. Note that the bolt is inserted through the hole closest to the
nozzle opening, and the boot is then positioned so the peg on the pump mounting surface inserts in the top second hole
of the boot. This allows for correct alignment of the nozzle when inserted into the boot.

Pump Foot Installation

The mounting foot is bolted to the bottom of
the pump using the four supplied socket head
cap screws. Mount the foot with the bolt flanges
inboard of the mounts on the pump as illustrated.
Torque to 50 in lb. with 4 mm hex key.
Mounting peg
Mounting bolt
7
Figure 3

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Fill-rite nextex nx3204Fill-rite nextex nx3204fFill-rite nextex nx3205eFill-rite nextex nx3205feFill-rite nextex nx3210bFill-rite nextex nx3210fb ... Mostrar todo

Tabla de contenido