Pressure Control Knob Settings; Connection To The Mains Network; Cleaning Preserving Agent When Starting-Up Of Operation Initially; Taking The Unit Into Operation With Coating Material - Titan Performance 1150e Serie Instrucciones De Uso

Airless equipo de alta presión para pulverizar
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4.2
Pressure control knob settings (Fig. 5)
1. Yellow zone (Minimum Bar - 115 Bar)
2. Green zone (115 - 230 Bar)
3. Black zone (pump turned OFF)
4. Red zone (Pulse Clean)
1
Min. PSI
(Bar)
4
Pulse
Clean
3
On/O
4.3

Connection to the mains network

The unit must be connected to an appropriately-
grounded safety outlet.
Attention
Before connecting the unit to the mains supply, ensure that the
line voltage matches that specified on the unit's rating plate.
4.4
Cleaning preserving agent when starting-
up of operation initially
1. Immerse the suction tube (Fig. 6, Item 2) and return hose
(1) into a container with a suitable cleaning agent.
2. Open the relief valve (3), valve position PRIME
(k circulation).
3. Switch the unit (4) ON.
4. Turn the pressure control knob (5) to minimum pressure in
the yellow zone.
5. Wait until the cleaning agent exudes from the return hose.
6. Close the relief valve, valve position SPRAY (p spray).
7. Pull the trigger of the spray gun.
8. Spray the cleaning agent from the unit into an open
collecting container.
Performance Series 1150e
GB
2
Max. PSI
(Bar)
4/5
4.5
Taking the unit into operation with coating
material
1. Immerse the suction tube (Fig. 6, Item 2) and return hose
(1) into the coating material container.
2. Open the relief valve (3), valve position PRIME
(k circulation).
3. Switch the unit (4) ON.
4. Turn the pressure control knob (5) to minimum pressure in
the yellow zone.
5. Wait until the coating material exudes from the return
hose.
6. Close the relief valve, valve position SPRAY (p spray).
7. Trigger the spray gun several times and spray into a
collecting container until the coating material exits the
spray gun without interruption.
8. Increase the pressure by slowly turning up the pressure
control knob.
Check the spray pattern and increase the pressure until
the atomization is correct.
Always turn the pressure control knob to the lowest setting
with good atomization.
9. The unit is ready to spray.
9
Starting operation
3
1
2

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido