Kohler K-2529 Guía De Instalación Y Cuidado página 7

Tocador
Ocultar thumbs Ver también para K-2529:
Tabla de contenido

Publicidad

2.
Assemble the Vanity
Studs/Montants/Varillas roscadas
Front Rail (with tube)
Rail avant (avec tube)
Riel delantero (con tubo)
Rear Rail
Rail arrière
Riel posterior
NOTE: Slight pressure might be needed to assemble the components.
Assemble the Right Frame
Lay the right frame with attached drawer on a protective surface with the red
interior facing up.
Place seven studs into the stud inserts, as shown.
Insert four wood dowels into the dowel holes.
Position the bottom shelf over the right frame with the large flange to the back.
Align the bottom shelf holes over the studs and dowels, then insert the shelf onto
the frame.
Align and insert the front rail (with tube) onto the corner connector, studs, and
dowel on the frame.
Align and insert the rear rail onto the studs and dowel on the frame.
Attach the Left Frame
Place seven studs into the stud inserts on the left frame.
Insert four wood dowels into the dowel holes on the left frame.
Align and insert the studs, wood dowels, and corner connector on the left frame
onto the bottom shelf and rails.
Kohler Co.
Bottom Shelf
Étagère
inférieure
Left Frame
Estante inferior
Cadre gauche
Marco izquierdo
7
Right Frame
Cadre droit
Marco derecho
Connector
Connecteur
Conector
Wood Dowels
Goujons en bois
Espigas de madera
1106944-2-B

Publicidad

Tabla de contenido
loading

Tabla de contenido