Siemens SITRANS F FCT030 Manual Del Usuario página 15

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Quick Commissioning wizard
The Quick Commissioning wizard includes zero point adjustment. Before entering the zero point wizard perform the following
steps in the plant:
Note
Preconditions
Before a zero point adjustment is initiated, the pipe must be flushed, filled and at an absolute flowrate of zero preferably also
at operating pressure and temperature.
1. Flush out the flowmeter until a homogenous flow is established and the tubes completely filled.
Figure 6-1
Best practice zero point adjustment with a by-pass line and two shut-off devices
2. Establish zero flow for example by closing the shut off-valves.
3. Wait 1 to 2 minutes, for the system to settle, and then perform zero adjustment as described in the following steps.
4. During the process a progress bar is visible in the display.
5. At the end of the zero adjustment, the outcome is displayed as an offset and a standard deviation.
The Quick Commissioning wizard will guide you through configuration of parameters essential for your application. You
configure parameters essential for your application by selecting the configuration path and subwizards appropriate for your
application.
The Basic Configuration wizards guide you through setup of process values (Process Values wizard) and inputs and outputs
(Input/Outputs wizard) for your application.
FCT030 transmitter
15
A5E03650800-AH, 05/2015

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido