Connecting The Energy Meter - SMA SUNNY BOY STORAGE 3.8-US Instrucciones De Instalación

Ocultar thumbs Ver también para SUNNY BOY STORAGE 3.8-US:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SMA Solar Technology AG
8. If necessary, trim unused insulated conductors flush with the cable sheath or fold it over the
cable sheath.
9. Connect the conductors of the communication
cables to a 6-pole terminal block. Pay attention to
the assignment of the terminal block and
communication connection on the battery and/or
automatic transfer switch and make sure that CAN L
and CAN H consist of a pair of conductors.
10. Make sure that the conductors are plugged into the terminal points tightly by pulling slightly on
the conductors.
11. Insert the terminal block for the communication
connection into the jack BATx on the battery
interface module. If only one battery is available,
insert the plug into the jack BAT1. If multiple
batteries and/or an automatic transfer switch are
available, insert the communication connection of
the first battery into the jack BAT1 and connect all
other communication cables in succession to the
respective jacks.
12. Press the communication cable with cable shield into
the shield clamp on the busbar below the
communication assembly.
6.5

Connecting the energy meter

This section describes how to connect the energy meter to the inverter.
The energy meter measures the flow of energy out of and into the utility grid. The measured values
of the energy meter are transmitted to the inverter and influence the charging behavior of the
battery. Along with the energy meter, two electrical current strength transducers must be installed
between the grid-connection point and the feed-in point of the battery inverter and the PV system.
Installation Manual
6 Electrical Connection
SBSxx-US-10-IA-xx-12
39

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Sunny boy storage 5.0-usSunny boy storage 6.0-us

Tabla de contenido