Control Panels - RIB JOLLY 20 Manual De Instrucciones

Operador para puertas enrollables equilibradas con muelles
Ocultar thumbs Ver también para JOLLY 20:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

G
B
PRELEASE KNOB FOR JOLLY ELECTROBRAKE: ASSEMBLY PROCEDURE
1° - Insert the steering compass (B) into the cable (A), as shown in the drawing.
2° - Insert the sheated cable (C) along the cable (A).
3° - Insert the compass (D) onto the cable (A) as shown.
4° - Insert part (E) paying attention that part (F) has been completely screwed.
5° - Insert the compass with the blocking screw (G) against part (F) and tighten the
hexagonal screw with a key n° 7.
6° - Fix part (H) with part (F).
To safely carry out the movement of the rolling gate it is important to
verify that:
MAINTENANCE
To be undertaken only by specialized staff after disconnecting power supply.
Every two years it is advisable to check if the screws of the pulley and the screw fixing to
the shaft are tighten.
Check that the springs are properly balanced and lubricate the guide with silicone grease.
ACCESSORIES
For the connections and the technical data of the optional equipments follow the relevant handbooks.

CONTROL PANELS

MINI ELECTRONIC CONTROL PANEL FUNCTIONS
Control of 1 motor
Functioning with manned operation (open - close)
ACCESSORIES CONECTABLE
FLAT Push Button
Surface / Embedded Key Selector
Strong Box STONE and FLAT
SPARK Light Yellow
- there are handles on the rolling gate;
- their position does not create dangerous points during the use;
- the manual effort to move the rolling gate must not exceed 225N for the
doors located in private sites and 390N for the doors located in commercial or
industrial sites (values indicated in point 5.3.5 of EN 12453 standard).
ATTENTION: the activation of the release can cause an incontrollable movement of the
rolling gate in case the latter is not perfectly balanced.
24
10
MINI - code ABQM090

Publicidad

Tabla de contenido
loading

Tabla de contenido