ORDERING SPARE PARTS

The spare parts must be ordered only by fax
using the enclosed modulate "R1" complete with
all the data required in order to ensure the rapid
despatch of spare parts.
IMPORTANT
For
electrical
components
220V/230V/240V 50 Hz supply (check on the
specification plate of the defective part), add to
the order code the letter corresponding to
the rating required as given in the following
table:
A
220V/230V 60Hz.
B
240V 50Hz.
C
200V 50Hz.
D
200V 60Hz.
E
190V 50Hz.
F
115V 60Hz.
G
110V 60Hz.
H
208V 50Hz.
I
24V 50Hz.
L
240V 60Hz.
M
254V 50Hz.
Example 1:
A 230V 50Hz vacuum motor is required.
Complete order information:
Machine model: Table Type .....
Registration No. 98503
Code No. 06793 – vacuum motor 230V/50
Hz
1 piece
Example 2:
The same vacuum motor, but 220V/50 Hz.
Complete order information:
Machine model: Table Type .....
Registration No. 98503
Code No. 06793/A vacuum motor 220V/60
Hz
1 piece
N.B.
1. The parts that appear in this manual without
an accompanying code number ARE NOT
AVAILABLE from stock.
2. The codes "POS. 17" or "POS. 66" etc. that
appear next to some parts have nothing to
do with the spare part code for these parts,
and should not therefore be quoted in
orders for spare parts.
C H A P T E R 4
other
than
for
Page 4-10
STORAGE OR DEMOLITION
In case of a long period storage, it is necessary
to
disconnect
the
pneumatic feeding sources.
a) Drain the boiler, the condensates tanks and
also the water feeding tank (if existing).
b) Drain all the water left into the pump, by
unscrewing the hexagonal screw on the
lower side of the pump casing (the side of
the water feeding), then screw again.
c) Carefully clean the internal walls of the boiler
of any sediment or scaling.
d) Clean the boiler connections and pipes to
remove any scaling.
e) When
all
these
completed, turn off the water feeding valves
and the drainage valves.
Carefully refit all the panels of the machine and
cover it with a cloth to shelter from the humidity.
In case of demolition of the machine, proceed as
follows:
a) Drain the boiler, the condensate tank and the
water feeding tank directly into the sewerage
system after having made sure that no
harmful impurities are inside the water.
b) Remove all the electric, pneumatic and
hydraulics components from the panels where
they are fixed.
c) Collect into proper container the following
parts: plastic, bakelite, cast iron, iron, copper,
brass, steel, fabrics, rubber etc. and take
them away according to the rules in force.
THE SPECIFICATIONS, THE DESCRIPTIONS
AND THE ILLUSTRATIONS CONTAINED IN
THIS BOOKLET ARE NOT IN ANY WAY
BINDING. DUE TO CONTINUOUS RESEARCH
AND
DEVELOPMENT
PRODUCTS,
THE
ALTER
SPECIFICATIONS
PREVIOUS NOTICE.
We trust that these few pages will be of
use to you and wish you 'Buon lavoro!' as
we say in Italy — May your work go well!
E N G L I S H
hydraulics,
electric
operations
have
been
TO
IMPROVE
OUR
MANUFACTURER
MAY
WITHOUT
Technical Office
and

Publicidad

Tabla de contenido
loading

Tabla de contenido