EdilKamin PELLET-BLOK Instalación Uso Y Mantenimiento página 27

Ocultar thumbs Ver también para PELLET-BLOK:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 59
N.B.: IMPORTANT FOR INSTALLATION CONDITIONS
Insulation
External intake
NOTES ON FITTING THE COVERING
If using a prefabricated Edilkamin covering, In order to define the exact position of the PELLET-BLOK, it is important
to check which covering will be used to complete it.
Positioning differs according to the model chosen (see assembly instructions given in the packaging of each covering).
Always check that installation is perfectly vertical and horizontal.
COVERINGS, COUNTER-HOODS AND THEIR VENTILATION
Before installing the covering, check that all connections, commands and moving parts are perfectly functional.
Check this with the fireplace on and working for a few hours. Do so prior to fitting the covering in order to intervene
as necessary.
Finishing works, such as construction of the counter-hood, covering assembly, pilaster preparation, painting, etc.,
should be carried out once the final test has been passed.
Edilkamin will therefore not be held liable for any charges deriving from both demolition and reconstruction works,
even where consequent to replacement of any faulty fireplace parts.
Rather, at least 1 cm. (approx.) space must be left to allow air to flow, thereby preventing heat from accumula-
ting. The counter-hood can be created from fireproof plasterboard panels or plaster sheets. When creating this,
the air circulation grill must be included, as previously specified.
THE MANTEL CAN BE CONSTRUCTED WITH FIRE RESISTANT PANELS IN PLASTERBOARD OR
GYPSUM BOARD. AERATION GRILLES FOR PREVENTING ANY EXCESS TEMPERATURE INSIDE
MUST BE PROVIDED FOR DURING CONSTRUCTION.
During the construction phase of the covering it is fundamental to ensure that the combustion air is restored
to prevent pressure phenomena in the room where the fireplace is installed
(refer to the Chapter regarding the external air inlet on page 26)
In particular, when making the bottom edging, under the fireplace, the following must be present:
- a suitable opening to allow for the passage of recycled air from the room
- the ability to remove the central portion in order to inspect and/or replace the fans, smoke extractor and cir-
cuit board*.
- if the base is not removable, the emergency button must be remotely connected (in the event the remote con-
trol is broken). Contact the DEALER.
In addition to the above, always consider the indications given by paragraphs 4.4 and 4.7 of standard UNI 10683/2005
"insulation, finishes, coverings and safety recommendations".
INSTALLATION
*
Internal mantel
ventilation grilled
Warm air outlet at
the front
Recycled air intake inspection of
electromechanical devices
27
*
There must be two ventilation grilles (surfaces
greater than 300cm²); the first must be at a height
which is lower than the hearth, while the second
must at a height greater than 30cm with respect to
the upper profile of the outlet.
These grilles prevent the accumulation of heat insi-
de, which is then used to help heat the room of
installation.
*
(surfaces greater than 300cm²)

Publicidad

Tabla de contenido
loading

Tabla de contenido