USER'S MANUAL. PROLITE-40
10.
If the splice is successful you will not observe any discontinuity on the Optical
fiber when monitoring on the display. Then lift the lid and the two levers that
hold the fiber on each side of the made splice.
11.
Lift the fiber up by holding it horizontally on each side about 10 cm from the
central point where the Optical fiber has been spliced and place the protective
tube centred on the area where the splice was made.
02-2011
Figure 31.-
Figure 32.-
Page 59