Bradley Terreon 54 Manual Del Usario página 12

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TDB3108, WF3208
Adaptive Infrared Assembly for A Drain and O Drain Units
4a
without Tie Pipe Option continued...
Place the infrared module assembly on top of
D
sprayhead . Rotate until infrared module locks in
with tie bar . Drop two infrared module wires down
to valve assembly .
Skip to step F for units without soap.
For units with soap option, install the spacer, soap
E
dispenser and cover using the third tie rod (8-5/8"
long) and second coupling nut as shown . Secure
with acorn nut and set screw .
F
Secure infrared module cover and top cover with
acorn nut and set screw .
For O Unit: Install 1/2" nominal copper tubing
G
supply lines (pass them through holes in cover
down through support column) and connect to
stops using suitable fittings .
12
4/30/2013
Unit with "A" Drain and I.R. Module
Shown, Also Available with "O" Drain
Soap
Dispenser
Coupling
Nut
Coupling
Nut
Tie Rod
(STD) 21-5/8"
(JUV) 18-1/8"
Support Tube
STD (S57-005)
JUV (S57-006)
Bradley • 215-1187 Rev. P; ECN 13-00-001
Installation
Top
Cover
8-5/8" Tie Rod
Spacer
Module
Cover
4-1/4" Tie Rod
I .R . Module
Assembly
(S50-344)
Tie Bar
Sprayhead
(S05-054)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tdb3108Wf3208

Tabla de contenido