Adaptive Infrared Assembly - Bradley Terreon 54 Manual Del Usario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Adaptive Infrared Assembly for A Drain and O Drain Units
4a
without Tie Pipe Option
A
Install hemmed end (not sharp end) of
support tube with gasket onto bowl .
Connect 1/2" supply tubing to sprayhead with
3/8" NPT to 1/2" tube connector and place
B
sprayhead onto support tube . Run the tubing
down through the support tube and connect
to valve tube connector .
I .R . Module Assembly
(S50-344)
Support Tube
STD (S57-005)
JUV (S57-006)
Support
Tube Gasket
(125-011)
Pre-Pack
(S45-055)
1/2" Supply Tube
Pedestal Assembly
(S17-242)
Bradley • 215-1187 Rev. P; ECN 13-00-001
Tie Rod Pre-Pack
(S45-1336)
Tie Bar
Valve Assembly
(S50-369)
Place the upper tie bar (notched at both
corners of each end) on top of sprayhead .
Connect the longer tie rod to the 4-1/4" tie
C
rod using the coupling nut with hex head
set screws . Run the tie rod assembly down
through upper tie bar and secure from
underneath the bowl using lower tie bar (no
notches) and hex nut with socket head set
screw .
Actuator
Module
Assembly
Top Cover
Sprayhead
(107-099 (A))
(107-179 (O))
Module Cover
(S04-083)
Nut
Sprayhead
(S05-054)
Tie Rod
(176-008A)
Drain
(S45-273)
Terreon
classic bowl is optional) (Part No . Varies
with color of bowl . Contact your local
Bradley Rep for assistance)
Access Panel
(186-1456)
A/O
(A Shown)
TDB3108, WF3208
Tie Rod Pre-Pack
Coupling
Nut
Supply Tube
Section View of
A/O Unit Assembly
Deep Bowl (ADA bowl shown,
®
4/30/2013
Cover
Tie Bar
Tie Rod
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Tdb3108Wf3208

Tabla de contenido