2.6.5.a ASSEMBLING BRACKETS (OPTIONAL)
- engage the short ceiling in the insert corner and tighten the screws
- attach power cables engaging the connectors
- Install ceiling shelves , connecting before the power
cord to each ceiling lamp
- Fix the ceiling with Plexiglas screws pommel
(Cod.9).
WARNING!
The ceiling light at this stage is very
delicate . Do not exert efforts and avoid
shocks with the next steps .
- Insert glass shelves using the Plexiglas pommel
These operations are represented in Fig.16b
WARNING!
The shelves are pre-curved and must be
assembled with the upward curvature .
Silk screen " TEMPERED - UP " must be
readable from the top .
- In the terminal version join the ceiling to the bracket
using the screw ( Cod.11 ) and washer nylon (Cod.12)
- the Heated Shelf (if present) must be mounted as
a normal shelf. Once it has been mounted, the two
Faston terminals must be connected to the shelf
electrodes for powering the shelf.
WARNING!
In case of a double shelf, the Heated Shelf
can only be installed in the upper position.
Fig.16b
A
Fig.16c
Fig.16d
Cod.
11
Cod.
12
55
B
C
Cod.
9
GB