PLEASE READ THE INSTRUCTIONS CAREFULLY BEFORE IN-
STALLING
Important
Please ensure that you thoroughly check the product upon receipt since
we cannot accept responsibility for any damage reported after instal-
lation. Should you find any damage, please immediately notify the for-
warder.
WE RECOMMEND CHECKING THAT ALL THE ARRANGEMENTS
COMPLY WITH THE INSTRUCTIONS FOR PRE-INSTALLATION.
I Unpack the bath and lift it only by the rim and never by any pipe
line or electric equipment (use protective gloves).
I Check for any damage or defects by removing the protective
plastic film (damages from impact or scratches reported after
installation are not covered by our guarantee).
I Check that the clamps holding the rubber couplings and
the air lines are tightly fastened.
I The installation of the whirlpool baths can be made against finished
(tiled) walls and floor.
The panels allow access to electromechanical devices installed un-
der the bath rim, as well as proper aeration required for water-air
mixture during hydromassage.
Aeration must be guaranteed also if Jacuzzi
used (see "Instruction for pre-installation"). Panels must be
firmly installed and proper tools must be used when being
removed. Openings, holes, grids, used for aeration, should
not allow the introduction of objects having a diameter of
12 mm or larger.

PRELIMINARY OPERATIONS

i
I (
1 detail 1) Where required, apply the seal with two-sided
adhesive tape (A) on the lower part of the tub edge after
having removed all traces of dirt. Remove the protective
backing (B) and apply the seal. Cut the part in excess (detail 2).
i
I (
2 ) Place the tub in its location of installation. Level it and
adjust the height by manually turning the feet (A) located on
the corners of the tub.
The upper level of the tub, measured at the end of the edge,
NOTE:
must be at a height of 57 cm (65 cm for Sharp Extra) from the
floor. To compensate for possible irregularities of the floor, the
bath feet can be regulated from -0,5 + 1 cm
DO NOT TOUCH BLOCKING NUTS (G) MARKED WITH A RED AR-
i
3 ).
ROW STICKER (
i
I (
3 ) Mark on the floor a hole for each outer foot. One hole is
enough.
Remove the bath and drill the floor.
Insert screw anchors (B). Adjust center feet (A1) so they rest
i
2 ).
firmly on the floor (
If the tub calls for installation of Jacuzzi
edge of the bath, install them before the tub is positioned
and secured in its location of installation.
i
I (
drainage outlet provided following the instructions and con-
nect it to the drain using the specific adjustable siphon (sup-
plied). Before tightening the relevant screws (5) place the
drainage pipe central to the drainage hole (detail A). Com-
plete installation by inserting a plug (6) and the cover (7).
Check that the column control, after closing the drain, is positioned
as shown in the figure (
i
I (
ble water leaks caused by transport damage should be made.
Fill the bath up to approx. 5-6 cm. above the uppermost hydro-
massage jets.
Please make sure that all joints and fittings are thoroughly in-
spected, before emptying the tub.
i
I (
to the floor.
i
(
I Connect the electrical box to the network and earth sys-
tem, following the electrical diagram and the directives
contained in the chapter "Electrical Safety".
ASSEMBLING THE TAPS AND FITTINGS
®
panels are not
(if included)
In the accessory kit box, which contains the various taps and
fittings, you will find the instructions for assembling them.
ASSEMBLY OF ACCESSORIES
i
I (
7 part. 1) Fit the rotating jets (contained in the accessory
kit box by inserting the nozzle in the nozzle body; then insert
the lid so that the pin is inserted in the central hole of the
nozzle.
Make sure that the grooves under the cover and inserted in the
corresponding notches in the nozzle body.
I (part. 2) Fix the suction nozzle cover with o-ring using the
specific screw.
I (part. 3) Pressure fit the flange cover on the whirlpool flange
cover.
I (
detail 4 ) Snap fit the lid on the spotlight body (optional).
Important: Keep the plastic conical tool (A) needed for removing
the hydromassage nozzles.
I Insert the switch knob into place.
I Run a hydromassage cycle, making sure that there is no leakage,
particularly in the hydraulic connections and drain.
5
4-4a-4b-4c-4d ) At this stage, attach the syphon and the
i
5
).
6 ) Before fixing the bath to the floor, a final test for possi-
3 ) Drain the bath and secure all outer feet with screws (C)