Final Setup; Level The Dryer - GE GFDR485 Manual Del Propietario E Instalación

Ocultar thumbs Ver también para GFDR485:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Instructions
FINAL SETUP
[]
LEVEL THE DRYER
Stand the dryer upright
near the final location and
adjust the four leveling legs at the corners to ensure
that the dryer is level from side to side and front to
rear.
[]
DRYER START-UP
Press the Power button.
Power
NOTE: If the dryer has been exposed to
temperatures
below freezing for an extended
period of time, allow it to warm up before pressing
Power. Otherwise, the display will not come on.
The dryer is now ready for use.
[]
PLUG DRYER IN
__-_
Ensure proper
l _-_J
i l "ground
exists
L..___
before use.
]0

Publicidad

Tabla de contenido
loading

Tabla de contenido