CRESTO Resq DD Instrucciones De Uso página 16

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 213
Evacuation is conducted as follows:
1.
Check that rEsq dd™ is in lanyard arrestor position with winder retracted.
2.
Attach the equipment by/in an approved anchor point in compliance with EN 795
or equivalent to a breaking force of 12 kN, recommended one metre above the
descent point. Ensure that the intended descent route is free from obstacles that
might hinder the descent process.
When carrying out this task - anchoring - the operator/user must always use fall
protection equipment fixed to a safe and secure anchor point.
Fall protection
3.
Throw the sack with the lanyard down to the final descent point if this is possible,
and can be accomplished in a responsible manner. Alternatively the sack can be
taken down by the first evacuee.
check that the lanyard does not come into contact with, or end up close to any
sharp edges.
14 |
© CRESTO AB 2013 | RESQ DD CM1 V 1.4 - SE | PAT.PEND. 11196042.3 | 2013-06-03
EN 795 or
equivalent 12 kN
(approx. 1200 kg)
Fig. 10

Publicidad

Tabla de contenido
loading

Tabla de contenido