3.
Pull the lanyard feed through the equipment until it is fully tensioned be-
tween the distressed person and the equipment. Pull out and position the
winder in winching position, see below.
4.
rEsq dd™ is now in manual winching position. Using the winder, lift the
evacuee until their fall protection has been relieved and can be disconnected.
20 |
Hold the lanyard feed tense
when winching to avoid any
slippage of the winch function.
Fig. 19
© CRESTO AB 2013 | RESQ DD CM1 V 1.4 - SE | PAT.PEND. 11196042.3 | 2013-06-03
Fig. 18
Fig. 20