Water Supply And Drain Connections; Start-Up Procedure - Hoshizaki FM-1200ALKE Manual De Instalación

Ocultar thumbs Ver también para FM-1200ALKE:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 26
3. WATER SUPPLY AND DRAIN
CONNECTIONS
WARNING
Connect to potable water supply only.
Note: A plumbing permit and services of a licensed
plumber may be required in some areas.
* The connections to the mains water supply
must be made in accordance with the countries'
current requirements of the Water Supply or
Water Fittings Regulations.
* I c e m a k i n g w a t e r m u s t b e p o t a b l e w a t e r.
Where scaling can be caused by water quality,
installation of an external filter or softener
is recommended. Contact your local water
treatment professional or Hoshizaki service
agent.
* Water supply pressure should be minimum 0.05
MPa (0.5 bar) and maximum 0.8 MPa (8 bar).
If the pressure exceeds 0.8 MPa (8 bar), use a
proper pressure reducing valve. Do NOT throttle
back the supply tap.
* The icemaker drain is gravity flow, so ensure
drain pipe has an adequate pitch or fall.
Water Supply
Inlet G3/4
Water Supply Line
Shut-off Valve
Drain Valve
Separate piping to approved
drain. Leave a 5cm vertical
air gap between the end of
each pipe and the drain.
Floor
Fig. 8
Drain Outlet
R3/4
Bin Drain Outlet
3/4 FPT
5cm air gap
Drain
* Water should drain into an open trap.
* Drain lines should not be piped directly to the
sewer system. A vertical air gap of a minimum
of 5 cm should be between the end of the drain
pipes from the icemaker and the storage bin and
the floor drain.
* Water supply connection is intended to be made
by means of a pipe, not a hose set.

6. START-UP PROCEDURE

1) C h e c k t h a t t h e p o w e r s u p p l y c o r d i s
disconnected.
2) Move the operation switch on the operation
panel to the "ON" position.
Operation Panel
Ice Button Display Stop Button
Maintenance Button
(service use only)
3) Open the water supply tap.
4) Connect the power supply and energise.
5) The display will illuminate in the "ICE" mode.
6) The following should occur in sequence:
a) Water reservoir will fill.
b) Gear motor will start.
c) Compressor will start.
IMPORTANT
1. Check the conditions and quality of the ice
production.
2. Do not use ice produced in the trial run. It
might be contaminated with foreign matter
in the water circuit. Discard or flush down
the drain.
5
ENGLISH
Operation Switch
Fig. 9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Fm-1200alke-nFm-1800alkeFm-1800alke-n

Tabla de contenido