Drive Belt 512-712: Replacing; Egular Maintenance; Daily Operations; Weekly Operations - IPC 512 Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 117
Remove the belt (fig. G, ref. 1) from the side arm (fig. G, ref. 4)
Replace the belt
Attach the side arm (fig. G, ref. 4) to the idle toothed wheel again.
Screw up the pin (fig. G, ref. 3).
Fit the belt (fig. G, ref. 1) onto the pulley (fig. G, ref. 2)

8.2.7. Drive belt 512-712: replacing

Rotate the cowling.
Remove the belt (fig. H, ref. 1) from the groove of the pulleys.
Fit the new belt (fig. H, ref. 1) onto the pulleys.
8.3.
Regular maintenance

8.3.1. Daily operations

empty the bins.
make sure there are no wires or straps rolled around the centre brush.
recharge the batteries according to the procedure described.

8.3.2. Weekly operations

check for wear of the FLAPS. If necessary, replace.
Check the condition of the suction air filter and make sure it is undamaged. If
necessary, replace.
check the level of battery electrolyte and top up with distilled water if necessary.

8.3.3. Six monthly operations

Have the electricity circuit checked by qualified personnel.
ENGLISH
19

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

712 serie512 e512 s512 e rider512 s rider712 e ... Mostrar todo

Tabla de contenido