Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

1

Electric connections

The steps :
Connect the two motors.
Connect the power supply cable.
Connection of the antena.
Connecting the two motors
Connect the link between the motors before connecting to power supply.The motor installed
on the gate pillar which opens first and closes last is the motor M1.
M1
M2
The motor M1 moves the left leaf, which
opens first and closes last:
M2
M1
The motor M1 is always connected between terminals 11 and 12.
The motor M2 is always connected between terminals 13 and 14.
M1
Blue
Brown
Blue
or
Brown
Blue
or
Brown
Extension cord
The motor M1 moves the right leaf, which
opens first and closes last:
1
Electric connections
Connect the power supply cable.
Connect the ground wire:
M2
Extension cord
Connection of the antena.
For optimal working, the right position of
Blue
the antena is essential.
Brown
Never cut the antena wire.
Connect the phase and the neutral :
Blue wire
Red/brown,black wire
Green/yellow wire
The wiring colors must
be respected.
Neutral
Phase
Ground
20

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Axovia sga 5000Axovia sga 6000

Tabla de contenido