Complete Routing Of The 795 Rs; Installing Routing - Look 795 RS Serie Manual De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

EN
N.B. : Your 795 RS frame is routed for mechanical assembly (black liners under the crankset
housing). In addition, your frame has white tubing to help you route the electrical cables
when fitting electrical equipment.
Rear derailleur hanger :
A spare rear hanger is provided in the kit in case one becomes bent or broken after a fall.
When fitting the rear hanger, tighten the screws to torque 1Nm. When removing / refitting, add
a drop of medium thread locking agent (type LOCTITE 243 ™) on each screw.
Mechanical / electrical cable routing configuration :
The 795 RS has end stops for compatibility with both mechanical and electrical equipment. Ask
your LOOK retailer for the list of compatible groupsets.
N.B. : The 795 RS is compatible with the Campagnolo EPS V3 groupset; when fitting this
groupset, follow the manufacturer's recommendations.
Open the pages showing Figs. 1 and 2 at the beginning of the instructions and Figs. 3,4,5, and
6 at the end.
Mechanical routing : configuration A (AEROLIGHT) and B (LIGHT)
1 / Remove the hanger end cap (F). Take care not to pull on the black liners.
2 / Remove the white pre-routing tubing of the electrical version.
3 / Take two derailleur gear sheathes 110cm in length, pass the front derailleur gear sheath
through the entry ③ (Fig. 2) and the rear derailleur gear sheath through the entry ② (Fig. 2).
Take the sheathes out through the opening ⑤ (Fig. 1).
26

COMPLETE ROUTING OF THE 795 RS

Installing the routing

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

795 aerolight rs795 light rs

Tabla de contenido