Final Works; Preparing The Commissioning Procedure - Lenze E94ASHE Serie Instrucciones Para El Montaje

Ocultar thumbs Ver también para E94ASHE Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

9

Final works

9.1

Preparing the commissioning procedure

You need the following for commissioning:
Keypad EZAEBK0001
ƒ
or
Computer with Windows® operating system (XP or 2000)
ƒ
Lenze PC software »Engineer«
ƒ
Connection with the controller via an interface, e.g.
ƒ
– Diagnostic interface X6 with USB diagnostic adapter
– System bus (CANopen)
– Communication module
Software manual for the technology application used
ƒ
The communication manual for the network of the automation platform
ƒ
Mains voltage or 24−V voltage supply for the control electronics of the controller
ƒ
Follow the instructions of the software and/or read the documentation.
EDK94ASH24 DE/EN/FR/ES/IT 5.0
Preparing the commissioning procedure
l
Final works
9
75

Publicidad

Tabla de contenido
loading

Tabla de contenido