9
Final works
Initial commissioning on 400 V mains voltage
9
Final works
9.1
Initial commissioning on 400 V mains voltage
The regenerative power supply module can be operated at a mains voltage of 400 V after
it has been installed according to these mounting instructions.
The regenerative feedback is activated via the digital input RFR.
How to proceed:
1. Switch on 24 V supply voltages:
– for the mains filter
– for the regenerative power supply module (optional)
2. Switch on 400 V mains voltage.
3. Activate/deactivate regenerative feedback via the digital input RFR.
9.2
Initial commissioning on 230 V or 480 V mains voltage
For operation on a mains voltage of 230 V or 480 V, first the mains voltage within the
regenerative power supply module has to be set. This setting is made in C00173 and can
be carried out using a keypad or the »Engineer« Lenze PC software.
For commissioning you require:
An EZAEBKx00xkeypad,
ƒ
or
A computer with a Windows® operating system (XP or 2000)
ƒ
The Lenze »Engineer« PC software
ƒ
A connection to the regenerative power supply module via an interface, e. g.
ƒ
– Diagnostic interface X6 with USB diagnostic adapter
– CAN system bus
– Communication modules in the expansion slots M1/M2
The software manual for the technology application used
ƒ
The communication manual (KHB) for the network of the automation platform
ƒ
Switch on 24 V supply voltages:
ƒ
– for the mains filter
– for the regenerative power supply module
After the setting has been carried out according to the mains voltage available:
1. Switch on mains voltage.
2. Activate/deactivate regenerative feedback via the digital input RFR.
74
l
EDK94ARN24 DE/EN/FR/ES/IT 3.0