Connection Of The Negative Pressure Line To The Closed Vessel - Siemens SITRANS P500 Instrucciones De Operación

Ocultar thumbs Ver también para SITRANS P500:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 98
3.4.2

Connection of the negative pressure line to the closed vessel

When taking measurements in a closed container without or with little condensation formation, the negative pressure line is
not filled.
h
Start of scale value
U
h
Full scale value
O
p
Pressure
Measurement assembly on a closed container:
no or little condensation separation
When taking measurements in a closed container with strong condensation formation, you must fill the negative pressure
line (mostly with the condensation of the measured medium) and install a condensation pot.
For measurement on open vessels there is no need to connect the minus pipework, since the minus side is open to the
atmosphere.
4
Connecting
4.1
Basic safety instructions
WARNING
Unsuitable cables and/or cable glands
Danger of explosion in hazardous areas.
Only use suitable cables and cable glands complying with the requirements specified in Chapter "Technical data
(Page 27)".
Tighten the cable glands in accordance with the torques specified in Chapter "Technical data (Page 27)".
When replacing cable glands use only cable glands of the same type.
After installation check that the cables are seated firmly.
14
Δp
Start of scale value to be adjusted
MA
Δp
Full scale value to be adjusted
ME
ρ
Density of the measured medium in the container
g
Acceleration due to gravity
Formula:
Start of scale value
Δp
= ρ · g · h
MA
U
Full scale value
Δp
= ρ · g · h
ME
O
SITRANS P500 with HART
A5E02344532-04, 12/2014

Publicidad

Tabla de contenido
loading

Tabla de contenido