Steelcase Thread Manual Del Usuario página 4

Ocultar thumbs Ver también para Thread:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

®
Thread Assembly Checklist:
Read and Understand Assembly Directions (Pay extra attention to Warnings, Cautions, and Notices).
All disciplines have been contacted and have reviewed assembly directions (Electrician,
Dealer/Installer, Carpet Installer, Dry Wall Repair/Paint (in-wall installation only).
Pre-job Briefing Conducted by Person Responsible for Installation (Page 5).
Before drilling, verify no hidden hazards in floor conflicting with layout of anchoring
holes (Page 2).
Verify the floor is flat according to Warnings section (Page 2).
For in-wall installation only: Cut the wall floor plate and reattach adjacent floor plate sections to floor to
allow the infeed to sit flat.
Electrician to connect infeed to the appropriate junction box without making final building connection
(Page 7-13). NOTE: The Thread power system must be on a GFCI protected circuit.
Attach sections of track together, according to the designer layout, utilizing 2 screws to attach each track.
Cover the remaining receptacles with fillers, according to the designer layout, utilizing 2 screws to
attach each filler (NEMA filler must have provided dust cover or tape to cover receptacle).
Anchor tracks and fillers to floor (vacuum all drilled locations prior to assembling concrete fasteners)
(Page 17-19).
o 1 screw per filler
o 1 screw at each end of track
o 1 screw at least every four feet along track
o 3 screws for floor infeed cover, avoiding the junction box
Assemble the ramps and fillers to the tracks (Page 19).
Verify proper carpet/conformable floor covering thickness (Page 3).
Cut holes in floor covering to provide access to connector and infeed locations (template provided) (Page 22-24).
Roll carpet adhesive or carpet tape over raceway and ramps, avoiding the connectors (Page 24).
Place floor covering in final position.
Remove provided dust cover or tape from covered NEMA receptacles.
Assemble the connector covers (Page 25).
Ensure all required electrical inspections are completed.
Electrician to turn on power to the Thread circuit.
Connect all required Power Hubs, Adapters, and other attached electrical equipment.
Page 4 of 75
24207101 Rev G

Publicidad

Tabla de contenido
loading

Tabla de contenido