Steelcase Thread Manual Del Usuario página 5

Ocultar thumbs Ver también para Thread:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

®
1.
The person in charge of the installation must conduct
a pre-job briefing with the employees involved before
they start each job, covering:
• Hazards associated with the job,
• Work procedures involved,
• Special precautions,
• Energy-source controls, and
• Personal protective equipment requirements
(see OSHA 29 CFR 1926.952 and NFPA 70e
for detail).
2.
Locate the design layout of the system to be built
(See example to the right).
• The design layout should have the following
elements identified at all places in the system:
• Raceway type (Power Track or Power Track Infeed)
• Power Track Infeed Position (Inside of wall, outside of wall
or in floor)
• Power Track length (2 feet, 3 feet,...up to 12 feet)
• Type of connector (Blank, One Door, Two Door,
NEMA Monument)
• Connector orientation, ie, Orientation of the Doors
or NEMA Monument.
3.
Limit length of Thread electrical run to 70 ft. max from
building power connection to farthest user connection (NEMA
Monument or Low Profile Connector) for proper function.
4.
Locate the provided items:
• Round Cardstock Template (Connector or Floor Infeed)
• Horseshoe Cardstock Template
(Power Track Infeed - Outside of Wall)
ONE DOOR LOW
PROFILE CONNECTOR
8' POWER TRACK
4' POWER TRACK
8' POWER TRACK
ONE DOOR LOW
PROFILE CONNECTOR
NOTE: Door and NEMA monument
positions and orientations will need
to be noted.
BLANK LOW
PROFILE CONNECTOR
TWO DOOR LOW
PROFILE CONNECTOR
TWO DOOR LOW
PROFILE CONNECTOR
8' POWER TRACK
ONE DOOR LOW
PROFILE CONNECTOR
8' POWER TRACK
3' POWER TRACK
NEMA MONUMENT CONNECTOR
4' POWER TRACK INFEED, IN THE WALL
ONE DOOR LOW
PROFILE CONNECTOR
NEMA MONUMENT
CONNECTOR
TWO DOOR LOW
PROFILE CONNECTOR
TWO DOOR LOW
PROFILE CONNECTOR
Page 5 of 75
24207101 Rev G

Publicidad

Tabla de contenido
loading

Tabla de contenido