Figure 14 Pump tubing preparation
1 To intake tubing
2 Alignment dots
3 To fitting on sampler base
4 Length for controller with standard liquid detector
5 Length for controller with optional non-contacting
liquid detector
6 Length inside the pump
7 Length for the refrigerated sampler
8 Length for the AWRS
9 Length for refrigerated sampler and controller with
standard liquid detector
10 Length for refrigerated sampler and controller with
non-contacting liquid detector
11 Length for AWRS and controller with standard
liquid detector
12 Length for AWRS and controller with non-
contacting liquid detector
English 21