Adaptive Infrared Installation - Bradley Terreon TDB3104 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
Adaptive infrared assembly for A drain and O drain units
5a
without Tie Pipe option
A
Install hemmed end (not sharp end) of
support tube with gasket onto bowl.
Place sprayhead with 3/8" tubing onto
support tube. Run the tubing down through
B
the support tube and connect to valve tube
connector. Make sure the spray holes point
away from the wall.
Restraining Bracket
IR Module Assembly
Standard Tie Rod (176-008A)
Juvenile Tie Rod (176-008)
Support Tube
STD (S57-005)
TAS/JUV (S57-006)
Support
Tube Gasket
(125-011)
Semi-Circ. Bowl Pre-Pack
(S45-1523)
Tie Bar Pre-Pack
(S45-055)
Standard Pedestal Assembly
(S17-259)
TAS Pedestal Assembly
(S17-345)
Bradley • 215-1078 Rev. T; ECN 12-00-004
Tie Rod Pre-Pack
(S45-1336)
(140-126)
(S50-367)
Tie Bar
Valve Assembly
Place the upper tie bar (notched at both
corners of each end) on top of sprayhead.
Connect the longer tie rod to the 4-1/4" tie
C
rod using the coupling nut with hex head
set screws. Run the tie rod assembly down
through upper tie bar and secure from
underneath the bowl using lower tie bar (no
notches) and hex nut with socket head set
screw.
IR Module
Assembly
Top Cover
Sprayhead
(107-099 (A)
(107-179 (O)
Module
Cover
Sprayhead
(S05-054B)
Terreon
Bradley Rep for assistance)
Access Panel
(186-1456)
A/O
(A shown)
TDB3104, WF3204
Tie Rod Pre-Pack
Coupling
Nut
Supply Tube
Section View of
A/O Unit Assembly
Drain
(S45-273)
Semi-Circular Bowl
®
(Part No. Varies with color
of bowl. Contact your local
1/15/2013
Cover
Tie Bar
Tie Rod
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Terreon wf3204

Tabla de contenido