Rough-In Specifications - Bradley Terreon TDB3104 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

TDB3104, WF3204

Rough-In Specifications

1/2" Nominal Copper
Type A Drain
- Supplies from below
or through wall
- Vent from below or
through wall off-drain
4" (102) Clearance Hole
Type B Drain
- Supplies from above
- Vent through ceiling
off trap inside pedestal
1/2" Nominal Copper
Tubing Supply from Above
6
Tubing Supplies
Through Wall
7-5/8"
(194)
4"
(102)
7-5/8"
(194)
5-1/4"
3-1/4"
(133)
(83)
Trap for Wall Outlet Only
6" to 13-1/4"
Drain Through Wall
(152 to 337)
Supplies Through Wall
12"
(305)
1-1/4"
(32)
7/8"
(22)
Cold
4" (102)
Hot
7/8"
(22)
5-1/4"
(133)
Vent
Drain Through Floor
1/15/2013
1/2" Nominal Copper Tubing for Cold Supply Through
Floor (optional), Stub Up 2-1/2" (64) Above Floor
2" NPT Drain Through Floor, Stub
up 3" (76) Above Floor
13" R Top Access
54" (1372) Bowl
7-3/8" R Bottom Access
1/2" Nominal Copper Tubing for Hot Supply Through
Floor (optional), Stub Up 2-1/2" (64) Above Floor
Drain and Supplies Through Floor Trap
Located Below Floor (Optional)
1-1/2" NPT Vent to Ceiling
13" R Top Access
54" (1372) Bowl
7-3/8" R Bottom Access
2" NPT Drain, Stub Out
3" (76) Above Floor
Bradley • 215-1078 Rev. T; ECN 12-00-004
Installation
(mm)
(mm)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Terreon wf3204

Tabla de contenido