RIGHT
FRONT
LEFT
REAR
4. Attaching Runways to Rear Yoke:
A. Determine direction of approach in bay.
B. Position left runway in bay with hydraulic cylinder
hose connection to rear of bay. Cables and sheaves
are pre-assembled in left runway but not in the right
runway. Runway needs to be up off floor so shipping
restraints can be removed from cable ends, air and
hydraulic lines, and cylinder rod. Pull cable ends, air,
and hydraulic lines out for assembly.
Run Cables Through
Retainer Before Attaching
Them to Pull Bar
Cable Retainer
(Typical)
Do Not Cross Cables
Cable Retainer Not
Shown to Clarify Cable
Roping Illustration
Right Front Cable (#2)
VIEW FROM FRONT
Right Front Cable (#1)
Left Rear Cable (#4)
VIEW FROM REAR
OPEN YOKE
CABLE ROUTING
LEFT FRONT #1
LEFT REAR #4
Left Front Cable (#1)
Right Front Cable (#1)
Right Rear Cable (#3)
C. Position rear yoke at end of runways. The opening in
the side of the yoke should be lined up with the cable
sheaves in the runway ends. Feed cable ends through
yoke openings. Be sure cables are not crossed inside
yoke. Feed cable #1 through right runway, Fig. 3 and 4.
Assemble sheaves and bearings into both ends of right
runway, Fig. 5. Make sure cables are in proper sheave
grooves, Fig. 3. Do not assemble sheaves in yoke ends
at this time.
1
3
RIGHT FRONT #2
2
4
3
LEFT
FRONT
RIGHT
REAR
Fig. 3
RIGHT REAR #3
Fig. 4