Hach PHOSPHAX sc Manual De Instrucciones página 13

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 39
English
b. Screw in the blind plug (item 3) in the thread of the overflow
vessel (item 1) and insert the sample tube in a beaker (for
example 150 mL) with standard solution for the validation.
Note: To receive stable measurement values, close the door of the
analyzer.
8. Press Enter to start the validation.
Note: The remaining time is displayed in seconds:
(Discharge value + measurement value)
9. Press Enter to escape.
The results are displayed to note down.
The discharge value and the Conc value are counted down to
zero.
The validation is finished when the process shows the service
mode and the remaining time is 0 seconds.
For the adjusted number of validation measurements, the
values are listed and the calculated average of this value is
displayed.
Note: The data log records the validation values and average value from
the analyzer.
10. Press Enter to proceed.
Note: Press Start to confirm the inquiry to return to the measurement
process or to the service mode.
11. Select Enter and modify the instrument to the original analyzer
configuration.
12. Start the measurement mode or hold the service mode.
Maintenance
×
5 minutes = remaining time/sec
13

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Phosphax indoor sc

Tabla de contenido