Through-The-Wall Installation-Optional; Important - GE ASH08 Manual Del Propietario E Instrucciones De Instalación

Ocultar thumbs Ver también para ASH08:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Through-the-Wall Installation Instructions—Optional
The case may be installed through the wall
in both existing and new construction.
Read completely, then follow step-by-step.

IMPORTANT

1
Through-the-wall installation is not
appropriate if any of the side louvers in the
case will be obstructed by the wall.
All side louvers in the case must project on
the outdoor side of the wall.
The room side of the case must project into
the room at least 1
3
The case must be installed level from side-
to-side and with a slight tilt from front to
rear. Use a level; about a 1/2 bubble will be
the correct case slant to the outside.
A
Remove the air conditioner from the case.
For specific instruction, refer to the Window
Installation Instructions.
B
Make certain that a wall receptacle is
available close to the hole location or make
arrangements to install a receptacle.
C
Place the case in the wall opening and
secure with 12 1" long #10 wood screws.
NOTE: Drill pilot holes, if necessary, for
proper installation. If the frame is oversized,
use shims to prevent case distortion.
" from the finished wall.
4
2
FINISH THE WALL OPENING
Caulk all four sides on the outdoor side of
the case to prevent moisture from getting
through to the interior wall. Use of flashing
(drip rail) will further prevent water from
dripping inside the wall and down the
outside of the building.
Lintel angle (if required)
Caulking
OUTSIDE
Air louvers
(must project on
the outdoor side
of the wall)
Wood Filler and Caulking
(above and below the flashing)
Flashing (Drip rail)
15
Plaster line
Trim molding
(if desired)
INSIDE
Bottom rail
") min.
4.5 cm (1
3
/
4

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Asw08Ash10Ash12

Tabla de contenido