Ferroli BlueHelix HiTech RRT H Instrucciones De Uso, Instalación Y Mantenimiento página 312

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

BlueHelix HiTech RRT H
System draining
The drain cock ring nut is located under the
safety valve inside the boiler.
To drain the system, turn the ring nut (ref. 3
- fig. 27) counter-clockwise to open the
cock. Do not use any tools; use hands only.
To drain only the water in the boiler, first
close the shut-off valves between the sys-
3
tem and boiler before turning the ring nut.
fig. 27
312
EN
cod. 3541V480 - Rev. 00 - 04/2021

Hide quick links:

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido