ASTRALPOOLHEAT SERIES · AIR/WATER SYSTEM
The electrical installation should be done by qualified professionals, keeping in mind the following points:
1.
Connect the equipment following the wiring diagram included in this manual.
2.
Place a U-curve thermal-magnetic circuit breaker in the general power connection to protect the line in
the case of a short in the circuit.
3.
Place a differential circuit breaker in the general power connection to protect the equipment from
possible grounding problems. The differential breaker should be minimum 30 mA.
4.
Before installing the connections, be sure to disconnect the electricity so that the power supply is turned
off.
5.
Connect the power supply wires to the unit's input terminal.
6.
Connect the grounding wire to its corresponding terminal.
7.
Connect 9 and 10 terminals in parallel with the purification pump clock.
IMPORTANT: The heat pump should always operate together with the purification pump. We must have
the precaution never to interconnect timers or programmers which may stop the purification pump and leave
the unit working alone.
All local and national electricity codes concerning the protection of defects in electric power lines should be
respected at all times during the electrical installation.
Verify the torque of all electrical connections.
The electrical resistance between the ground and any electric terminal will be verified to be over 1 megaohm.
Otherwise, the equipment will not start up until electrical loss is located and repaired.
In the case of fluctuations in the power supply, a power supply stabilising system is recommended in order to
protect the equipment.
PURIFICATION PUMP VOLTAG-FREE CONTACT
9
0
1
F
N
R
S T
AUTOMAT
F
F
N
N
02
U2
03
U3
2
220V
3
380V
M
M
FILTRATION PUMP
© ASTRALPOOL 2010. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.
10
F
CLOCK
MANUAL
Purification
Pump Control
N
High Voltage
Connection
Figure 3: Electrical panel.
ENGLISH
Electrical Panel
(8 screws)
Page 23 of 246