Installation Guide
Installation Work Flow
Installing one projector
Follow the procedures below to mount the projector on a wall.
a
Installing the Setting Plate and the Projector (
b
Adjusting the Position of the Projector (
c
Calibrating the Interactive Pen (
d
Installing the Control Pad and the Pen Stand (
When installing the Touch Unit, finish installing the projector first, and then follow the procedures below.
(EB-1460Ui/EB-1450Ui only)
The procedure differs depending on where the Touch Unit is to be installed.
When installing the Touch Unit outside the whiteboard (using the Touch Unit Bracket)
a
Installing the Touch Unit (
b
Adjusting the Angle of Laser Diffusion (
c
Performing Touch Calibration (
When installing the Touch Unit on the whiteboard (without using the Touch Unit Bracket)
p.32)
s
p.46)
s
p.54)
s
p.61)
s
p.64)
s
p.69)
s
p.84)
s
10