Complete Installation; Remove Bypass Jumpers - Lutron LCP128 Serie Guia De Instalacion

Paneles de atenuación e interruptores
Ocultar thumbs Ver también para LCP128 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 21

Complete Installation

You have completed your panel installation.
For Onsite Factory Commissioning, call Lutron Technical Support and select Startup to schedule a field service
visit. Allow for 10 working days between day of call and scheduled visit.
If you purchased Telephone Startup (LCP128 only), stop here and complete the Control Location, Panel, and
Control Station Tables that are located in the back of the Setup and Operation. Once the tables are complete, call
Lutron Technical Support and select Startup. Please call 24 hours prior to desired system startup.
In the U.S., Canada, and the Caribbean: 1.800.523.9466
In Mexico: +1.888.235.2910
In Europe: +44.207.702.0657
In Asia: +65.6220.4666
In Japan: +81.355.758.411
In all other countries: +1.610.282.6701

Remove Bypass Jumpers

A. After all load wiring has been checked, turn
circuit breakers OFF.
B. Remove and store the bypass jumpers for
possible future use.
C. Turn circuit breakers ON.
Note. All circuits are now set to the default
Non-Dim load type. Non-Dim load types will
respond by immediately going to full ON in
any lighting scene (except the OFF scene).
Caution! Reuse the bypass jumpers
whenever work is being done on a load.
Damage caused by short-circuits and
miswiring is not covered by the product
warranty.
Panel installation, control station wiring, and load activation are now complete.
Next Step: Refer to the Setup and Operation Manual to set up the functions and operation of the panel.
R
Module with 4 outputs shown
Installation Guide for Dimming and Switching Panels
Bypass jumper
DH
DH
DH
DH
H
N
N
N
N
N
17

Publicidad

Tabla de contenido
loading

Tabla de contenido