2.2.1
Important safety procedures
a) Before carrying out any form of installation,
dismantling or maintenance on the actuator
or switchbox, ALWAYS disconnect all air and
electrical supplies.
b) Electrostatic Hazard. Clean only with a damp
cloth.
c) When replacing any items, use only HYTORK
supplied components and suitably qualified
and competent personnel.
Fig. 2
Standard mounting platform
Cover
assembly
Base
assembly
Mounting
platform
Fig. 3
Removing the cover
DOC.SVM.1 Rev: A
Installation and setting instructions
3
Fitting the SafeVision
1 Attach the proper mounting platform or mounting
bracket to the SafeVision using the bolt and washer
sets provided. When using Safemount mounting
platforms, place the platform centrally along the base of
the SafeVision housing and secure the bolts for one of
the bolt mounting patterns.
2 The SM 80-20 platform will fit Hytork actuator models
with a 20mm high Namur pinion & the VDI/VDE 30mm x
80mm bolt pattern.
3 The SM 130-30 platform will fit Hytork actuator models
with a 30mm high Namur pinion & the VDI/VDE 30mm x
130mm bolt pattern.
4 Operate the actuator to the fully closed position.
5 Attach the SafeVision and mounting platform/bracket to
the actuator, locating the tang drive of the SafeVision
drive shaft correctly in the slot on top of the actuator
drive pinion.
6 Secure complete assembly using bolt and washer set
provided.
4
Removing the cover
1 Unscrew the eight cover to base securing screws
located around the SafeVision housing until all the
threads are disengaged from the base assembly.
2 Lift the cover assembly, complete with visual indicator
display, upwards and away.
3 The switches, terminal rail and switch setting cams are
now fully exposed.
3
SafeVision Switchbox
March '04