Maintenance; Tools Needed - Vollrath 40834 Manual Para Operadores

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

MAINTENANCE

WARNING
Electrical Shock Hazard
Unplug unit before servicing.
NOTICE: The machine must be moved or transported in an upright
position.
NOTICE: Do NOT tilt the machine. Tilting could enable oil to flow out
of the pump and cause damage to the machine.
The following maintenance schedule is only a guideline. Actual
maintenance needs will vary depending on machine use. Inspect your
machine regularly.
Interval
Procedure
Weekly
Check the oil by viewing the Oil Inspection Window.
Inspect the seal bar for wear.
Inspect the seal pad under the lid for wear.
Inspect the lid gasket and lid.
Every six
Replace the oil in the vacuum pump. Contact Vollrath
months
Technical Services.
Replace the sealing wires and Teflon
Replace the seal pad under the lid.
Replace the lid gasket.
Yearly
Inspect the oil exhaust filter. Contact Vollrath Technical
Services.
Every four
Replace the lid, gas springs and seal cylinder
years
membranes. Contact Vollrath Technical Services.
Replace the Sealing Wires and Teflon
Check the sealing bar for damage. Replace the Teflon tape or sealing
wires if the seal quality is no longer sufficient or if the Teflon tape or
seal wires are worn.

Tools Needed:

• Phillips screwdriver
• Tensioning tool or pliers
• Scissors
• Lint-free cleaning cloth
• Replacement Teflon tape
• Replacement sealing wire
1. Pull up on the sealing bar to remove it from the machine.
2. Remove the Teflon tape that protects the sealing wires.
8
Vacuum Packing Machine with Dual 16" Sealing Bars and Advanced Control System (ACS) Operator's Manual
3. Remove the screws on the bottom side of the seal bar.
4. Remove the sealing wires.
5. Remove the Teflon tape from the sealing bar.
®
tape.
6. Clean the sealing bar with a lint-free cloth.
®
Tape

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido